- Published on
I got word from Maria today that the homework help they have been tirelessly giving the kids in the Milk Project seems to be helping.
(Seen in the picture...just one little batch of pictures and things they are tasked with finding online.)
None of the kids is currently scoring under 80%! Good news indeed of building up.
We knew that the sewer project the government has been working on for the neighborhood has been moving along after being stopped for several months. Building down indeed.
They started coming up our road, and even have the hole dug already where our connection will be (going through the man cave, see picture 2) although it will be months still before they finish and any kind of connection is possible.
This is good news!
Months though is what we will need. We will have to re-route everything we have done over the years, and that means digging trenches for new pipes, inspection boxes, drops along the way, etc. All coming together in one pipe that will exit to the road and join up with the network.
It might take us several guys and a couple months or more to make that happen.
It is not easy stuff...cutting/digging through concrete, rock walls, and more. It will be a huge undertaking, but in the end, a lot more peace of mind for the long term.
Who knows, they may have the neighborhood below us even with fully paved roads in 2021. What a thing to see that will be!
(Seen in the picture...just one little batch of pictures and things they are tasked with finding online.)
None of the kids is currently scoring under 80%! Good news indeed of building up.
We knew that the sewer project the government has been working on for the neighborhood has been moving along after being stopped for several months. Building down indeed.
They started coming up our road, and even have the hole dug already where our connection will be (going through the man cave, see picture 2) although it will be months still before they finish and any kind of connection is possible.
This is good news!
Months though is what we will need. We will have to re-route everything we have done over the years, and that means digging trenches for new pipes, inspection boxes, drops along the way, etc. All coming together in one pipe that will exit to the road and join up with the network.
It might take us several guys and a couple months or more to make that happen.
It is not easy stuff...cutting/digging through concrete, rock walls, and more. It will be a huge undertaking, but in the end, a lot more peace of mind for the long term.
Who knows, they may have the neighborhood below us even with fully paved roads in 2021. What a thing to see that will be!
0 Comments